Tender Advertisement #1184690
This Opportunity Has ClosedThis opportunity has already closed and is no longer open for submissions.
Brief
Porepunkah Township - Stormwater Drainage Strategy Plan
Location
EverywhereClosed On
Mon 01/03/2021 - 05:00 PM AEDTTender Details
The purpose of this study is to identify the existing stormwater flooding issues within Porepunkah township north of the Great Alpine Road and propose feasible mitigation options.
The outcome will be a Drainage Strategy Plan which provides prioritised recommendations for mitigation of flood problems and risks within the township, assuming land has been developed to its maximum potential in accordance with the current land use zonings.
The project scope includes provision of schematic designs, locations, benefit-cost assessments and priorities for all recommended new and/or upgraded infrastructure.
The outcome will be a Drainage Strategy Plan which provides prioritised recommendations for mitigation of flood problems and risks within the township, assuming land has been developed to its maximum potential in accordance with the current land use zonings.
The project scope includes provision of schematic designs, locations, benefit-cost assessments and priorities for all recommended new and/or upgraded infrastructure.
This information is not guaranteed to be accurate or complete. Please confirm all details with the Tendering Firm before responding.
Powered by Tenders.Net - Inventors Of E-Tendering