Tender Advertisement #1209818
This Opportunity Has ClosedThis opportunity has already closed and is no longer open for submissions.
Brief
Great Valley Trail - Bridge Construction - Construction of 3 Pedestrian Bridges and 2 Vehicular Bridges between Germantown and Harrietville in Alpine Shire
Contract #
CT21030Location
EverywhereClosed On
Tue 29/06/2021 - 01:00 PM AESTTender Details
Alpine Shire Council requests tenders from suitably qualified and experienced contractors for the construction of Bridges as outlined in the attached Invitation to Tender CT21030 documents, and drawing set CT21030 BRIGHT TO HARRIETVILLE BRDGES ift.pdf
In summary, there are 5 structures detailed within this tender. Design drawings are provided with the tender documentation.
2 bridges are required to take heavy vehicles, one of these is a 6.8m span concrete structure, the other is an 11m span steel structure with a concrete deck. These structures are to be constructed by 19 November, 2021.
2 bridges are 18m span, 2.35m wide pedestrian steel structures that are able to take pedestrians and light (service) vehicles. These structures have in-situ concrete decks, and one has an approach ramp. These structures are to be constructed by 19 November, 2021.
1 bridge is a steel structure, 24m span with a grated deck, able to take pedestrians only. This structure is to be constructed by 15 January 2022.
In summary, there are 5 structures detailed within this tender. Design drawings are provided with the tender documentation.
2 bridges are required to take heavy vehicles, one of these is a 6.8m span concrete structure, the other is an 11m span steel structure with a concrete deck. These structures are to be constructed by 19 November, 2021.
2 bridges are 18m span, 2.35m wide pedestrian steel structures that are able to take pedestrians and light (service) vehicles. These structures have in-situ concrete decks, and one has an approach ramp. These structures are to be constructed by 19 November, 2021.
1 bridge is a steel structure, 24m span with a grated deck, able to take pedestrians only. This structure is to be constructed by 15 January 2022.
This information is not guaranteed to be accurate or complete. Please confirm all details with the Tendering Firm before responding.
Powered by Tenders.Net - Inventors Of E-Tendering