Direct Tendering Portal for Gippsland Water
Tender Advertisement #1207938
This Opportunity Has ClosedThis opportunity has already closed and is no longer open for submissions.
Brief
Construction of New Clear Water Storage Basin at Moe WTP
Contract #
GW515Location
EverywhereClosed On
Thu 08/07/2021 - 04:00 PM AESTTender Details
This is a Lump Sum Contract, in the form of AS 4000-1997 (as amended) General Conditions of Contract, for the provision of all labour and material, site preparation works necessary for the Construction of New Treated Water Storage Basin.
The Works include construction of 25 ML earthen basin, installation of pipework, backwash
pump station, basin liner & cover and connections to the existing system.
The Works include construction of 25 ML earthen basin, installation of pipework, backwash
pump station, basin liner & cover and connections to the existing system.
This information is not guaranteed to be accurate or complete. Please confirm all details with the Tendering Firm before responding.


Powered by Tenders.Net - Inventors Of E-Tendering