Tender Advertisement #990828

This opportunity has already closed and is no longer open for submissions.
Brief
Bulivou Sector Cane Access Roads Rehabilitation Package 2
Contract #
RFP 18/020Location
EverywhereClosed On
Thu 10/05/2018 - 12:00 PM NZSTTender Details
The Reforest Fiji project comes under the Annual Action Programme 2013 of the Accompanying Measures for Sugar Protocol (AMSP) Programme which works to address the Fiji Government‘s “National Adaptation Strategy for the Fiji Sugar Industry“. Reforest Fiji is an initiative funded by the European Union (EU) and implemented by the Pacific Community (SPC).
The projects Key Result Areas are as follows:
Result 1: On-going soil erosion on the sloping foothills within the three selected sugarcane sectors
are reversed;
Result 2: Income to cane growers and native communities generated through the establishment and
ownership of forest plantations; and
Result 3: Improved road access, watershed, drainage and associated rural infrastructure in
sugarcane areas.
The road works aim to upgrade a minimum of 30km of cane access roads and associated infrastructure in the Bulivou sugarcane sector in Seaqaqa District, Vanua Levu and will be carried
out in 2 packages.
This Request for Proposal (RFP) is calling for proposals for Package 2, which includes the rehabilitation of 23 unsealed cane access roads covering 15.361 kilometres . The names as follows: The names as follows:(1)Bimlesh/Anand,(2)Bobby/ShiuDutt,(3)Dalipp/Rajan,(4)Divend/Singh (5)Davendra/Lal/Sakiusa,(6)FoodProcesssor/KumarSingh(7 Gani/Shiu/Sakiusa,(8)Jagdish/Akbal,(9) Jope/Reddy,(10)KhemChand/Sarju,(11)Mani Lal,(12)Mansoor/Koya/Saheed,(13)MohdAli/Jwahir,(14)Prabhu/Davendra,(15),(Saibaj/khairul,(16)Safiq/MohdAli,(17)Mr Shameem/Nawaz(18)Shaukat/Bhupen,(19)ShiuNarayan/Anup/Maharaj, (20)ShiuRam/Wazid Ali/Baram ,(21)Tabish/Ismail, (22)Taslim Hakim(23)Vesidrua Crossing.
The projects Key Result Areas are as follows:
Result 1: On-going soil erosion on the sloping foothills within the three selected sugarcane sectors
are reversed;
Result 2: Income to cane growers and native communities generated through the establishment and
ownership of forest plantations; and
Result 3: Improved road access, watershed, drainage and associated rural infrastructure in
sugarcane areas.
The road works aim to upgrade a minimum of 30km of cane access roads and associated infrastructure in the Bulivou sugarcane sector in Seaqaqa District, Vanua Levu and will be carried
out in 2 packages.
This Request for Proposal (RFP) is calling for proposals for Package 2, which includes the rehabilitation of 23 unsealed cane access roads covering 15.361 kilometres . The names as follows: The names as follows:(1)Bimlesh/Anand,(2)Bobby/ShiuDutt,(3)Dalipp/Rajan,(4)Divend/Singh (5)Davendra/Lal/Sakiusa,(6)FoodProcesssor/KumarSingh(7 Gani/Shiu/Sakiusa,(8)Jagdish/Akbal,(9) Jope/Reddy,(10)KhemChand/Sarju,(11)Mani Lal,(12)Mansoor/Koya/Saheed,(13)MohdAli/Jwahir,(14)Prabhu/Davendra,(15),(Saibaj/khairul,(16)Safiq/MohdAli,(17)Mr Shameem/Nawaz(18)Shaukat/Bhupen,(19)ShiuNarayan/Anup/Maharaj, (20)ShiuRam/Wazid Ali/Baram ,(21)Tabish/Ismail, (22)Taslim Hakim(23)Vesidrua Crossing.
This information is not guaranteed to be accurate or complete. Please confirm all details with the Tendering Firm before responding.