Direct Tendering Portal for Western Downs Regional Council

Tender Advertisement #1296279

You are previewing this tender advertisement. Log in to view the full details.

Register for Free
  This Opportunity Has Closed
This opportunity has already closed and is no longer open for submissions.
Brief

MM04-22-23 Design and Construction of Stage 1 - Trunk Water Mains - Moonie Highway - Dalby

Location
Everywhere
Closed On
Thu 25/08/2022 - 06:00 PM AEST
Tender Details
Western Downs Regional Council (WDRC) is commencing a three-year water security improvement project which will reliably increase existing drinking water supply by 2.2 ML/day and replace the failing existing 350mm internal diameter drinking water supply pipe between the Water Treatment Plant and the Edward St Reservoirs.
Stage 1 of the project will replace the existing trunk main between the Water Treatment Plant (WTP) and Watt St with a DN450HDPESDR11PN16 pipe and constructing a DN180PPR PN16 pipe for the raw bore water supply either in the same trench or separate trenches between these locations.
WDRC seeks an experienced water contractor to undertake the design and construction works in logical steps to minimise any disruption to the environment, public utility providers, and the community.
This information is not guaranteed to be accurate or complete. Please confirm all details with the Tendering Firm before responding.