| |
Tender # |
Region |
Brief Desciption |
Closing |
| 1568436 |
NSW |
Facility fit out (various works) |
26/11/2025 |
| 1568429 |
VIC |
Pipeline extension, pump station & vortex drop |
28/11/2025 |
| 1568334 |
O/S |
Evaluation / certification of technicians in refrigeration & air conditioning equipment maintenance |
19/11/2025 |
| 1568305 |
O/S |
Major renovation of heating system, repair of main entrance / restroom & equipment for people with disabilities |
17/11/2025 |
| 1568278 |
O/S |
Design & build of STEM school (various works) |
24/11/2025 |
| 1568187 |
O/S |
Equipment for small red deer farm (various) |
10/11/2025 |
| 1568105 |
NSW |
Office renovation / fit out (various works) |
10/11/2025 |
| 1568067 |
NZ |
HVAC chillers & cooling towers |
28/11/2025 |
| 1567957 |
O/S |
Refrigeration tools & equipment |
10/11/2025 |
| 1567897 |
O/S |
IT equipment (various) |
05/11/2025 |
| 1567739 |
O/S |
Electric heaters |
17/11/2025 |
| 1567641 |
O/S |
Air compressor systems |
09/11/2025 |
| 1567584 |
O/S |
Air conditioners & refrigerators |
06/11/2025 |
| 1567582 |
O/S |
Air-conditioner |
25/11/2025 |
| 1567552 |
O/S |
Solar power system & air condition |
03/11/2025 |
| 1567482 |
WA |
Airconditioning upgrade |
21/11/2025 |
| 1567478 |
VIC |
Depot air conditioning upgrade |
17/11/2025 |
| 1567323 |
NZ |
HVAC heating replacement |
14/11/2025 |
| 1567305 |
NSW |
Closed loop heat rejection system installation |
18/12/2025 |
| 1567203 |
O/S |
Server room (various) |
06/11/2025 |
| 1567131 |
O/S |
Heating system solutions |
05/11/2025 |
| 1567106 |
O/S |
Refrigeration & air conditioning training equipment / tools |
03/11/2025 |
| 1567055 |
WA |
Pole top switches |
05/11/2025 |
| 1567047 |
NZ |
Wellhead construction |
19/11/2025 |
| 1567039 |
WA |
HVAC replacement works |
06/11/2025 |
| 1566983 |
O/S |
Laboratory equipment (various) |
17/11/2025 |
| 1566854 |
O/S |
Rehabilitation of university & installation of solar power systems |
05/11/2025 |
| 1566721 |
ALL |
Facilities management categories of service |
24/11/2025 |
| 1566694 |
O/S |
Major refurbishment & maintenance works (various) |
06/11/2025 |
| 1566662 |
O/S |
Heat exchanger |
05/11/2025 |
| 1566644 |
SA |
Amenities upgrade |
26/11/2025 |
| 1566634 |
WA |
HVAC upgrade |
05/12/2025 |
| 1566557 |
O/S |
Refrigerated containers, walk-in-freezers & coolers |
10/11/2025 |
| 1566535 |
O/S |
Commercial refrigeration energy management systems |
11/11/2025 |
| 1566448 |
O/S |
Feasibility study & implementation plan to repurpose cooling towers |
07/11/2025 |
| 1566369 |
WA |
Mechanical services upgrade |
13/11/2025 |
| 1566306 |
WA |
Design and fitout - Operations Control Centre (various works) |
20/11/2025 |
| 1566257 |
O/S |
R290 inverter cold rooms |
07/11/2025 |
| 1566153 |
NSW |
Electricity |
04/11/2025 |
| 1566037 |
O/S |
Tools / equipment for training centres, refrigeration & air-conditioning workshops |
07/11/2025 |
| 1566034 |
O/S |
Tools / equipment for training centres, refrigeration, air-conditioning & car repair workshops |
07/11/2025 |
| 1566006 |
O/S |
Detailed design of construction of biomass boiler plant & cogeneration unit (various services) |
05/11/2025 |
| 1565969 |
NZ |
Heat pumps |
13/11/2025 |
| 1565956 |
NZ |
Roofing, internal & auditorium refurbishment (various works) |
15/11/2025 |
| 1565924 |
O/S |
Air compressor |
31/10/2025 |
| 1565897 |
O/S |
Water reverse osmosis desalination plant & solar PV system |
31/10/2025 |
| 1565762 |
TAS |
Mechanical (HVAC) services |
10/11/2025 |
| 1565623 |
O/S |
Desert / water coolers |
14/11/2025 |
| 1565582 |
O/S |
Aircon maintenance services |
13/11/2025 |
| 1565562 |
QLD |
Heating ventilation & air conditioning equipment |
26/11/2025 |